La Sagrada Família has been under construction for more than 140 years and is still unfinished in 2026. Its cornerstone was laid in 1882, Antoni Gaudí took over in 1883, and the building’s highest point was reached only on 20 February 2026, when the upper arm of the cross was placed on the Tower of Jesus Christ. The Catalan heritage authority expects the remaining work to be completed within the next decade, so no single “finished” date describes the whole basilica.
This 33-photo guide follows the project’s visible layers: the Nativity, Passion and Glory façades; the eighteen-tower skyline; Gaudí’s tree-like interior; and construction that is still advancing. The chronology and architectural terminology follow the Catalan Cultural Heritage summary, the basilica’s official construction history and its 2025 annual report.
Why La Sagrada Família has taken so long
The project began as a church designed by Francisco de Paula del Villar. After the cornerstone ceremony on 19 March 1882, Gaudí assumed responsibility in 1883 and transformed the commission into an unusually ambitious synthesis of architecture, nature and religion. He worked exclusively on the Temple from 1914, developing a Latin-cross plan, three narrative façades and a forest of branching supports rather than a conventional, quickly repeatable church design.
The Tool Desk
Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Gaudí died in 1926. His disciple Domènec Sugranyes took over, and later architects continued from Gaudí’s plans, models and published material. The Spanish Civil War caused a decisive interruption in 1936: the workshop was vandalised, plans and photographs were burned, and plaster models were smashed. Francesc de Paula Quintana resumed site management in 1939 using surviving workshop pieces and information reconstructed from published plans and photographs. The work therefore combines completed historic fabric, reconstructions and later construction carried out within Gaudí’s design logic.
Popular on Amazon
Construction is also dependent on the resources available to the foundation rather than a state-funded building program. The 2025 annual report records €134.5 million in income, all from private sources, and says 51.7% of expenditure went to construction. Those figures describe that year’s finances; they are not a total cost for any individual tower or façade.
Construction timeline
| Year | What happened |
|---|---|
| 1882 | The cornerstone was laid on 19 March for del Villar’s project. |
| 1883 | Gaudí took over the project and building work began under his direction. |
| 1891 | Work started on the Nativity façade. |
| 1914 | Gaudí began working exclusively on the Temple. |
| 1925 | The Saint Barnabas bell tower on the Nativity façade was completed. |
| 1926 | Gaudí died; Sugranyes became responsible for the project. |
| 1936 | Civil War violence destroyed workshop plans, photographs and plaster models. |
| 1939 | Quintana took over site management and work resumed with saved and reconstructed material. |
| 2005 | The Nativity façade and crypt received UNESCO World Heritage designation. |
| 7 November 2010 | Pope Benedict XVI consecrated the Temple and declared it a minor basilica. |
| 2012 | Jordi Faulí became head architect and site manager. |
| 2021 | The Tower of the Virgin Mary was inaugurated. |
| 2022–2023 | The Evangelists’ towers were completed in stages. |
| 20 February 2026 | The upper arm of the cross was placed on the Tower of Jesus Christ, marking the basilica’s highest point. |
How to read the basilica’s architecture
The plan is a Latin cross. Three principal façades carry different narrative programs: the Nativity faces the story of Christ’s birth, the Passion presents his suffering and death, and the Glory is intended as the principal entrance and a vision of celestial glory. Their sculpture and composition should not be treated as interchangeable views of the same subject.
Also popular on Amazon
There are eighteen towers in the overall scheme. Twelve represent the apostles, four represent the evangelists, one represents Mary and the tallest represents Jesus Christ. Outside, the towers create a recognisable vertical silhouette; inside, branching columns evoke trees and carry the eye toward the vaults. Stained-glass windows filter daylight into coloured fields, making illumination part of the architecture rather than simple decoration.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
The UNESCO designation is specific, not blanket coverage of every completed or unfinished element: the crypt and the Nativity façade are the components identified in the heritage authority’s account. The designation should not be described as applying to the entire basilica under that wording.
Also popular on Amazon
The 33-photo visual guide
- Photo 1 — The basilica in its city setting. Begin with a wide exterior view that shows how the clustered towers rise above Barcelona and establishes the scale of the project before details take over.
- Photo 2 — The Nativity façade. This is the earliest major façade campaign, begun in 1891, and the side most closely associated with Gaudí’s completed historic work.
- Photo 3 — Nativity sculpture and vegetation. A closer frame should show the façade’s dense treatment of figures and natural forms, a visual expression of birth and growth.
- Photo 4 — The Saint Barnabas bell tower. The completed tower, finished in 1925, helps date the older Nativity-side work within the larger construction story.
- Photo 5 — The Passion façade. Use a frontal view to make its separate narrative identity clear: this is the façade devoted to Christ’s suffering and death.
- Photo 6 — Passion-façade geometry. A detail view can emphasize the more severe, angular impression of the Passion side without confusing it with Nativity sculpture.
- Photo 7 — The Glory façade. Show the third major elevation, planned as the principal entrance and associated with the theme of heavenly glory.
- Photo 8 — Glory portals and approach. A lower-angle frame should connect the entry zone to the basilica’s Latin-cross organization and its public role.
- Photo 9 — The tower cluster. Pull back far enough to show multiple towers together; the silhouette is a collective composition, not a single monument tower.
- Photo 10 — The cross on the Tower of Jesus Christ. The upper arm now marks the building’s highest point, the clearest visual sign that the project has reached a major vertical milestone while remaining unfinished.
- Photo 11 — The Evangelists’ towers. Include the four evangelist towers as a group or in a paired view, noting that their completion occurred in stages during 2022 and 2023.
- Photo 12 — The Tower of the Virgin Mary. The inaugurated tower provides a distinct landmark within the upper cluster and represents Mary in the eighteen-tower program.
- Photo 13 — A view that reveals the Latin cross. From an elevated position, frame the nave and transepts so the underlying cross-shaped plan can be read spatially.
- Photo 14 — Nave columns. Look along the interior supports to show how the columns divide and branch rather than standing as conventional straight shafts.
- Photo 15 — Branching capitals. A closer interior image can isolate the tree analogy: structural members spread like limbs as they meet the vaulting.
- Photo 16 — Stained-glass windows. Photograph a window bay with enough surrounding stone to show that the coloured glass is integrated into the structure.
- Photo 17 — Coloured light on the nave. The important subject is the changing field of filtered daylight, not a standalone window souvenir.
- Photo 18 — The crossing and vertical view. Point upward through the central space to connect the forest-like supports with the tower system above.
- Photo 19 — The apse and sanctuary. A centered frame should show how the interior’s religious focus sits within the larger geometric and natural vocabulary.
- Photo 20 — The crypt. Include the crypt as a distinct lower-level space and identify it accurately as one of the components covered by the UNESCO designation.
- Photo 21 — Nativity façade detail within the heritage area. Pair a close architectural detail with a caption that keeps the UNESCO reference to the Nativity façade, rather than extending it to the entire basilica.
- Photo 22 — Old and new construction together. A joint, change in surface or contrasting degree of completion can make the project’s layered chronology visible without assigning an unsupported date to a particular stone.
- Photo 23 — Tower masonry and openings. Frame the repeating openings and vertical stonework that allow the towers to read as both heavy masonry and porous, light-catching structures.
- Photo 24 — Two façades in one view. If the vantage permits, show how different narrative elevations meet around the building while retaining separate visual languages.
- Photo 25 — Interior verticality. A long upward composition should make the transition from floor-level columns to the high vaults legible.
- Photo 26 — Vault pattern. Concentrate on the ceiling geometry and the way repeated forms distribute attention across the nave.
- Photo 27 — Side aisle perspective. A lateral view can show the rhythm of columns, windows and circulation spaces that a frontal nave photograph may flatten.
- Photo 28 — The Chapel of the Assumption under construction. The 2025 annual report recorded this chapel at 8 metres toward a planned 30-metre height, a precise reminder that important sections remain incomplete.
- Photo 29 — Restoration at the Tower of Matthias. Include active restoration work as part of the basilica’s present condition; not every visible intervention is new construction.
- Photo 30 — The skyline from a distance. A remote view helps viewers compare the completed-looking silhouette with the still-changing tower cluster.
- Photo 31 — Visitors moving through the monument. A respectful interior or exterior circulation frame can convey that this is an active place of worship and a major visitor destination, not only a construction site.
- Photo 32 — Light, stone and scale. Combine a window, branching support and a human-scale architectural reference so the interior’s three-dimensional effect is apparent.
- Photo 33 — A final wide view. End with the whole composition—façades, towers and interior logic in one visual sequence—while making clear that the image records an ongoing project, not a finished endpoint.
What “completion” means in 2026
The February 2026 cross placement marks the highest point, but height is only one measure of completion. The Chapel of the Assumption was reported at 8 metres of a planned 30 metres, and restoration was under way at the Tower of Matthias in the 2025 annual report. The Catalan heritage authority’s “within the next decade” horizon therefore refers to finishing the remaining basilica work, not merely adding one final ornament.
This distinction matters when viewing photographs. A façade may look complete from street level while adjacent chapels, restoration zones or interior details continue to change. The most accurate gallery captions identify the specific façade, tower or interior space shown and avoid presenting the entire complex as finished.
Also popular on Amazon
Visitors and current practical information
The heritage listing records individual, group and school visits, along with accessibility services and audio guides. The address is Carrer Mallorca, 401, 08013 Barcelona. Opening hours, ticket prices, entry rules and availability can change, so consult the official visitor information for the date of your visit.
Quick wins for a faster PC:
Repair Windows errors before they cause bigger problemsFix Now →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Attendance shows the basilica’s continuing public importance: the foundation’s 2025 annual report records 4,877,567 visitors, compared with 4,833,658 in 2024. These are reported annual totals, not a daily capacity or a guarantee of entry at any particular time.
How the project survives its interruptions
The building’s long duration is not simply a story of slow work. Gaudí’s evolving design required complex models and carving; his death removed the project’s original director; the Civil War destroyed essential documentation; and later teams had to interpret what survived. Published plans, photographs and reconstructed models made continuation possible, while new architects worked within the established design framework.
The result is an architectural record of its own history. The Nativity façade preserves early work, the Passion and Glory elevations express different narrative and formal decisions, and the newest towers reveal a 21st-century construction campaign. Looking at all three together is more informative than asking whether one date can certify the entire basilica as complete.