October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
DocumentaryTube
Admit one · Blog

Robert Price’s Greenland Oil Project Delayed to Late 2027 Amid Documentary Backlash

Fortune reported that Greenland Energy’s first Jameson Land test well was delayed to late 2027. The company’s licenses, resource estimates, local concerns, and documentary plans remain distinct—and some details are disputed or uncertain.
Opened Runtime3 min Written byDocumentaryTube Team
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Greenland Energy’s proposed oil test well in the Jameson Land area was pushed to the end of 2027, according to Fortune’s August 14, 2026 report, after permitting delays and a dispute over moving equipment. The project also drew local criticism over how the company described its rights and addressed community concerns. The documentary associated with Phil McGraw, known as Dr. Phil, was described as paused, with its future uncertain—not as released or definitively canceled.

Why was the Greenland oil project delayed?

Fortune reported on August 14, 2026, that Greenland Energy’s first test well had been postponed until the end of 2027. The report attributed the delay to permitting slowdowns and a dispute concerning the movement of equipment. Robert Price, the company executive, said Greenland Energy remained committed to the project and told Fortune, “There’s a lot of time now to make sure that we get it right.”

That date is a reported target as of August 14, not a confirmed schedule for any later period. The available reporting does not establish whether subsequent approvals or logistical changes altered it.

What rights does Greenland Energy have?

The company does not own Jameson Land. After describing the area as owned by Greenland Energy, Price told Greenlandic broadcaster KNR on June 30, 2026: “We do not own the area. We have a license to explore for oil.” He apologized for using the word “ownership.” KNR had reported that Greenlandic law does not permit private ownership of land and that the company held exploration and exploitation permissions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Elebase USB to USB C Adapter for iPhone 18 Pro Max,USBC Car Charger Adapter | 4Pack Type C Female to A Male Cable Converter for Apple Duo 17 16 15 14 Plus,iWatch Watch 12 11 10,iPad 9 8 Air,Airpods 5 4
  • Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
  • Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
  • Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
  • Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
  • 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.

However, the scope and status of permissions for particular activities were disputed. The Guardian reported on July 9, 2026, that Greenland’s resources ministry said there were “no actually active permissions for any exploration activity or permissions for preparations for these activities.” The Guardian also reported that some older licenses covering Jameson Land remained valid after Greenland stopped issuing new exploration licenses in 2021. These accounts distinguish holding a license from having approval for every preparatory or drilling activity.

Has oil been found, and what does the 13-billion-barrel figure mean?

No commercial oil discovery is established in the cited reporting. Price told KNR that drilling would be needed to determine whether the area contains commercially viable quantities. The much-repeated 13-billion-barrel figure is a low-probability resource estimate, not a proven reserve or a discovery.

Rank #2
Sale
Anker USB-C Hub, 5-in-1 USB Hub for Laptops, 4K HDMI Multiport Adapter
  • 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
  • 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
  • Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
  • 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
  • What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
Figure What it represents
About 350 million barrels, with an estimated 90% probability A 2022 assessment by GEUS, Nunaoil, and the Greenland government, as reported by KNR on June 26, 2026; an estimate, not discovered reserves.
About 13 billion barrels, with an estimated 10% probability The high-end estimate from that same 2022 assessment, as reported by KNR; it does not mean 13 billion barrels have been found or can be produced commercially.
Two wells, each around 3,500 meters deep A plan Price described to KNR in 2026, not completed drilling.
30–45 days for the first well Price’s projected duration, as reported by KNR in 2026, not a verified operational result.

What concerns did residents raise?

Danwatch reported that residents at a public meeting in Ittoqqortoormiit asked about spill response, outstanding permits, and what would happen if oil were found. At the time of that reporting, the company had not received government approval for drilling, and information about spill response remained among the outstanding issues.

Those questions matter independently of the resource estimates: even if exploration identifies oil, a discovery would not itself settle whether production is approved, economically viable, or acceptable to affected communities. At the meeting, one resident’s question was recorded as “Men hvis I finder olie, hvad så?”—“But if you find oil, what then?”

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.

What happened to the Dr. Phil documentary?

KNR reported on July 7, 2026, that Phil McGraw would not visit Ittoqqortoormiit that year. The planned six-part series, titled Arctic Wildcatters, was expected to follow the company’s search for oil, but KNR said its future was unclear. Fortune later characterized the documentary as paused and its prospects as uncertain. The reporting does not establish that the series was released or permanently canceled.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How the project’s claims and status should be read

  • Exploration rights are not land ownership. Price corrected his earlier wording and described the company’s right as a license to explore.
  • A resource estimate is not a reserve. The 13-billion-barrel figure is the 10%-probability high estimate cited by KNR from a 2022 assessment.
  • A license does not resolve every permit question. The company’s account and the resources ministry’s reported position differ over which preparatory activities were authorized.
  • A target date is not proof that work can proceed. Fortune’s end-of-2027 date reflected the schedule reported on August 14, 2026, amid permitting and equipment-movement issues.

The project’s immediate story is therefore a delayed exploration effort under regulatory and community scrutiny—not a confirmed oil find, a transfer of land ownership, or a documentary with a settled release outcome.

Best Value
Sale
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display | 85W Max PD, 1 Powered USB-C 5Gbps & 2 Powered USB-A 3.0 5Gbps Data Ports, for MacBook Pro, MacBook Air, Dell and More (Black)
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Rank #4
Sale
UGREEN USB to USB C Adapter Combo 4-Pack, 10Gbps USB C Converter Space Gray
  • Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
  • Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
  • Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
  • Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
  • Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.